• MUG 22 Sept 2009

    1. MARTE specification

      1. update on status

        1. beta 3 accepted

        2. should become 1.0 really soon now

      2. main changes from beta 2

        Summary of Changes Made The MARTE FTF2 made changes that: • Improve compatibility with following related standards: ARINC, AADL, EAST-ADL and AUTOSAR. • Increased the clarity of the specification by précising the semantics of some of its concepts and by providing additional examples. • Fixed numerous minor consistency problems. • Added some minor features required for the MARTE domain. • Fixed editorial mistakes. Almost every issue has been resolved (including Resolved, Closed and Duplicate) and only 7 issues have been deferred. These latter was either considered as out of FTF scope or not handled because lack of time to define a satisfactoring resolution.

        1. clarification of the component model

        2. improvement of VSL

        3. modeling of modes

        4. better compatibility with AADL and EAST-ADL2

        5. allocation: alternate notation (assign)

        6. and lots of small corrections

    2. Projects around MARTE

      1. ADAMS

      2. Saturn

      3. Attest2

      4. Genesys

      5. Lambda

      6. Cesar

    3. Resources of the MUG

      1. mailing list

        1. names collected

        2. have to use a mailing list manager

          1. for free registration

          2. and moderation

      2. web site

        1. a prototype was shown

        2. based on a common database of

          1. links

          2. papers

          3. events

          4. ...

      3. will be completed and publicised when done

    4. MARTE UML Profile for Embedded Systems Design Workshop

      1. at DATE'10

        1. proposal submitted

        2. acceptation answer at the end of October

      2. will have to delay the CFP schedule

  • All Comments ( 0 )

    MUG 22 Sept 2009

    Added: 2009-09-22 16:18:26

    From: pboulet (Joined 2008-11-14 04:42:03)

    3766 views |3 downloads

    MUG 22 Sept 2009

    More From: pboulet

    SoC Design
MoCC
    SoC Design MoCC
    2010-05-28 09:39:59|3 views
    Problématique des
systèmes embarqués
    Problématique des systèmes embarqués
    2010-03-17 15:54:26|68 views
    Join-Calculus
    Join-Calculus
    2010-03-17 15:54:06|68 views
    Sécurité
    Sécurité
    2009-12-01 11:51:06|446 views
    Tolérance aux pannes
    Tolérance aux pannes
    2009-11-17 16:56:28|534 views
    Support noyau
    Support noyau
    2009-11-10 13:19:47|492 views
    Ordonnancement
    Ordonnancement
    2009-11-03 13:21:54|2159 views
    Synchronisation
    Synchronisation
    2009-10-20 12:06:43|1791 views
    SoC Design
MoCC
    SoC Design MoCC
    2009-10-19 09:46:40|199 views
    Communication 2/2
    Communication 2/2
    2009-10-13 08:13:09|776 views
    Communication 1/2
    Communication 1/2
    2009-10-06 13:04:35|2164 views
    Concepts fondamentaux
    Concepts fondamentaux
    2009-10-06 07:41:00|680 views
    MUG 22 Sept 2009
    MUG 22 Sept 2009
    2009-09-22 16:18:26|3766 views
    Problématique des
systèmes embarqués
    Problématique des systèmes embarqués
    2009-02-17 05:53:52|541 views
    Intervention
DaRT
AERES
    Intervention DaRT AERES
    2009-02-11 06:52:29|90 views