• Implementation OSN on HP Platform (Trial)

    1. Planning

      1. Hardware

        1. Requirement Hardware

          1. HP

            1. Blade

              1. BL460c G7

            2. Interconnect

              1. Cisco Catalyst Switch 3120x

            3. Memory

              1. 48G

            4. Network Interface Card

              1. HP NC532m dual Port

            5. Hard disk

              1. 2x 300G

            6. Power Consumption

            7. Dimension

            8. Power Connector

          2. BigIp F5

            1. Capacity/Throughput

              1. 1 GB

                1. Existing F5 6900 LTM

                  1. Maximum Capacity 6 GB (in and Out)

                  2. Existing Capacity 2GB (in and Out)

                2. Radware 5412 (Trial)

                  1. Maximum Capacity 20G

                  2. Power Consumption

                  3. Dimension

                  4. Power Connector

          3. Switch Cisco Catalayst

            1. 8 Port

              1. Existing Catalyst Switch 3560G

                1. Maximum Port 48 (UTP), 4 Port (SFP)

                2. Existing Port 24 Port

          4. Cable UTP

            1. Length Cable

            2. Total Cable

              1. 5 Cable

                1. 3 Cable from HP Blade to Switch 1

                  1. 1 Cable For Management

                  2. 2 Cable For Traffic

                2. 2 Cable from HP Blade to Switch 2

                  1. 2 Cable For Traffic

      2. Software

        1. Sizing

          1. Up to 800 MB

            1. 4 Blade HP BL460c G7

        2. Design

          1. Feature

            1. 2 Blade for Web (OSN)

              1. 1 Blade Collocated with MFM

              2. 1 Blade Collocated with CSM

            2. 1 Blade Video (MFM)

            3. 1 Blade Content Adaptation (WFM)

        3. IP Planning

        4. Hard Disk Planning

    2. Implementasi

      1. Survey

        1. Rack

          1. Rack 16.6

        2. Source Power

          1. AC Power Distribute by Rack Power

      2. Instalasi

        1. Instalasi Hardware

          1. Goods Arrival

          2. Checklist Hardware

            1. 4 Blade BL460c G7

            2. 2 Interconnect 1:10G

            3. RAM 48 GB

            4. Hard Disk 300G (2)

            5. Nic NC532m (2)

          3. Mounting/Power On

          4. Hardware Configuration

        2. Instalasi Software

          1. Installasi OSN

          2. Instalasi CSM

          3. Instalasi MFM

    3. Dokumentasi

      1. Network Design and IP Implementation

      2. SAT

      3. Working Permit

    4. Budget

      1. 2 Resources

  • All Comments ( 0 )

    Implementation OSN on HP Platform (Trial)

    Added: 2011-11-24 07:31:32

    From: nainggolan (Joined 2011-11-24 05:28:15)

    18 views |0 downloads

    Implementation OSN on HP Platform (Trial)

    More From: nainggolan

    Implementation OSN on HP Platform (Trial)
    Implementation OSN on HP Platform (Trial)
    2011-11-24 07:31:32|18 views
    Implementation OSN on HP Platform (Trial)