Implementation OSN on HP Platform (Trial)
Planning
Hardware
Requirement Hardware
HP
Blade
BL460c G7
Interconnect
Cisco Catalyst Switch 3120x
Memory
48G
Network Interface Card
HP NC532m dual Port
Hard disk
2x 300G
Power Consumption
Dimension
Power Connector
BigIp F5
Capacity/Throughput
1 GB
Existing F5 6900 LTM
Maximum Capacity 6 GB (in and Out)
Existing Capacity 2GB (in and Out)
Radware 5412 (Trial)
Maximum Capacity 20G
Power Consumption
Dimension
Power Connector
Switch Cisco Catalayst
8 Port
Existing Catalyst Switch 3560G
Maximum Port 48 (UTP), 4 Port (SFP)
Existing Port 24 Port
Cable UTP
Length Cable
Total Cable
5 Cable
3 Cable from HP Blade to Switch 1
1 Cable For Management
2 Cable For Traffic
2 Cable from HP Blade to Switch 2
2 Cable For Traffic
Software
Sizing
Up to 800 MB
4 Blade HP BL460c G7
Design
Feature
2 Blade for Web (OSN)
1 Blade Collocated with MFM
1 Blade Collocated with CSM
1 Blade Video (MFM)
1 Blade Content Adaptation (WFM)
IP Planning
Hard Disk Planning
Implementasi
Survey
Rack
Rack 16.6
Source Power
AC Power Distribute by Rack Power
Instalasi
Instalasi Hardware
Goods Arrival
Checklist Hardware
4 Blade BL460c G7
2 Interconnect 1:10G
RAM 48 GB
Hard Disk 300G (2)
Nic NC532m (2)
Mounting/Power On
Hardware Configuration
Instalasi Software
Installasi OSN
Instalasi CSM
Instalasi MFM
Dokumentasi
Network Design and IP Implementation
SAT
Working Permit
Budget
2 Resources
Implementation OSN on HP Platform (Trial)
Added: 2011-11-24 07:31:32
From: (Joined 2011-11-24 05:28:15)
18 views |0 downloads
Implementation OSN on HP Platform (Trial)